Filter by
104
results found
- Published by:
- British Geological Survey (BGS)
- Last updated:
- 06 August 2026
UKCCSRC Call 2 Project C2-214 . The dataset consists of six excel spreadsheets containing data from six dynamic operating scenarios for post-combustion CO2 capture on coal, implemented at the...
- Published by:
- High Speed 2 Limited
- Last updated:
- 04 July 2019
The data provided here relates to information and/or engineering design described within the HS2 London-West Midlands Environmental Statement deposited in Parliament as part of the hybrid Bill...
- Published by:
- British Geological Survey (BGS)
- Last updated:
- 06 August 2026
UKCCSRC Flexible Funding 2020. The experimental data was collected on a 1-inch bore gas-liquid two-phase CO2 flow rig in real time. The first column of the table is the time stamp. The second to...
- Published by:
- High Speed 2 Limited
- Last updated:
- 22 February 2024
Phase 2a West Midlands to Crewe GIS data
The data provided here relates to information and/or engineering design described within the High Speed Rail (West Midlands to Crewe) Environmental...
- Published by:
- High Speed 2 Limited
- Last updated:
- 25 March 2026
HS2 Phase 2b: from the West Midlands to Leeds and Crewe to Manchester
The data provided here relates to information and/or engineering design published during the Development Phase of High Speed...
- Published by:
- Environment Agency
- Last updated:
- 29 September 2020
Environment Agency Partnership and Strategic Overview teams understand and manage flood and coastal erosion risk by working flexibly with partners in ways that are good value and benefit...
- Published by:
- Skills Funding Agency
- Last updated:
- 12 December 2013
Banks Automated Clearing System File; General Accounting Summary reports; General Ledger Interface; Issue of references/mortgages; P60 End of Year Certificate's; P11D Expenses and Benefits forms to...
- Published by:
- Ordnance Survey
- Last updated:
- 16 April 2025
OS Open Built Up Areas represents the built up areas of Great Britain and contains three unique datasets, offering maximum flexibility to meet your needs: Built Up Areas, Built Up Extents and Non...
- Published by:
- Home Office
- Last updated:
- 14 November 2017
The police transformation fund is intended to transform policing by investing in digitalisation, a diverse and flexible workforce and new capabilities to respond to changing crimes and...
- Published by:
- Runnymede Borough Council
- Last updated:
- 30 April 2026
Dataset displaying open spaces in Runnymede. This includes parks & gardens, outdoor sports facilities, amenity green spaces, play areas and more (Last updated- year 2025).
This dataset has...
- Published by:
- Greater London Authority
- Last updated:
- 24 June 2026
The Embedded Capacity Register (ECR), formerly known as the System Wide Resource Register (SWRR), lists all generation, storage and flexible demand resources where the installed generation...
- Published by:
- Cambridgeshire Insight
- Last updated:
- 23 August 2018
The East of England Forecasting Model projects economic, demographic and housing trends in a consistent fashion. It covers a wide range of variables, and is designed to be flexible so that...
- Published by:
- Cambridgeshire Insight
- Last updated:
- 08 July 2026
The East of England Forecasting Model projects economic, demographic and housing trends in a consistent fashion. It covers a wide range of variables, and is designed to be flexible so that...
- Published by:
- Environmental Information Data Centre
- Last updated:
- 30 July 2026
The data contain measurements of the morphological shape of threespine stickleback from wild, F1 (filial generation 1) lab-reared, and F2-lab (filial generation 2) reared individuals. These last...
- Published by:
- Greater London Authority
- Last updated:
- 30 July 2026
The DNOA output shows future network constraints, the recommended solution and the current status in the solution progress. It indicates when, where and at what volume flexibility services will be...
- Published by:
- Greater London Authority
- Last updated:
- 06 August 2026
Number of cases of common mental health problems per 1000 of the population aged 16-74 by type of mental health problem. Data on rates are presented as total cases per 1000 population aged 16-74....
- Published by:
- British Geological Survey (BGS)
- Last updated:
- 06 August 2026
This study was carried out jointly by the University of Birmingham and the British Geological Survey. The report addresses the feasibility of using novel quantum-technology-based gravity sensors to...
- Published by:
- British Geological Survey (BGS)
- Last updated:
- 06 August 2026
This poster on the UKCCSRC Call 1 project Chemical looping for low-cost oxygen production and other applications was presented at the CSLF Call project poster reception, London, 27.06.15. Grant...
- Published by:
- British Geological Survey (BGS)
- Last updated:
- 06 August 2026
During 2010-11, as part of the Carbon Capture & Storage (CCS) Demonstration Competition process, E.ON undertook a Front End Engineering Design (FEED) study for the development of a commercial...
- Published by:
- City of London
- Last updated:
- 03 January 2024
Businesses looking to locate in the City of London who need a flexible, short-term office solution serviced office space or co-working space could provide the perfect solution. The attached...