Skip to main content

Filters

1,041 to 1,060 of 3,512 results
  • Wild bee abundance and species richness, survey data from Leighfield Forest, Leicestershire and Rutland, 2020

    Publisher
    Environmental Information Data Centre
    Updated
    30 July 2026
    This dataset contains records on the abundance and species richness of wild bees along transects in ten 1x1 km survey squares of the Leighfield forest region of Leicestershire and Rutland, UK...
  • Hydrological data from the Portoviejo River, Ecuador, 2021-2022

    Publisher
    Environmental Information Data Centre
    Updated
    30 July 2026
    This dataset contains daily measurements of river flow velocity (m/s), river discharge (m3/s), river depth (cm), and river width (m) from the Portoviejo River, Ecuador, from years 2021 and 2022....
  • Physical and geochemical properties of saltmarsh soils from narrow diameter gouge cores in UK saltmarshes collected between 2018 and 2021

    Publisher
    Environmental Information Data Centre
    Updated
    18 September 2026
    The dataset comprises of physical and biogeochemical measurements of saltmarsh soils from across 22 UK saltmarshes. Between 2018 and 2021, 462 narrow diameter gouge cores (30 mm in diameter) were...
  • Groundwater temperatures and levels from a field experiment in the Conwy Valley, North Wales, UK (2013-2015)

    Publisher
    Environmental Information Data Centre
    Updated
    18 September 2026
    Data showing groundwater temperature and levels from bore holes are presented. The data were collected from a field experiment in the Conwy catchment between December 2013 and June 2015. Data were...
  • Orthomosaic imagery for the South Saskatchewan River, Canada

    Publisher
    Environmental Information Data Centre
    Updated
    18 September 2026
    Data were collected in 2015, 2016 and 2017 to provide high resolution imagery for two sections of the South Saskatchewan River, Canada. Photographs were acquired using conventional aerial plane...
  • UKGEOS Cheshire - TH0421 Borehole Information Pack

    Publisher
    British Geological Survey (BGS)
    Updated
    25 September 2026
    The borehole information pack from borehole TH0421 at the UK Geoenergy Observatories (UKGEOS) facility at Thornton Science Park in Cheshire. This release from the British Geological Survey (BGS)...
  • UKGEOS Cheshire - TH0415 Borehole Information Pack

    Publisher
    British Geological Survey (BGS)
    Updated
    25 September 2026
    The borehole information pack from borehole TH0415 at the UK Geoenergy Observatories (UKGEOS) facility at Thornton Science Park in Cheshire. This release from the British Geological Survey (BGS)...
  • UKGEOS Cheshire - TH0414 Borehole Information Pack

    Publisher
    British Geological Survey (BGS)
    Updated
    25 September 2026
    The borehole information pack from borehole TH0414 at the UK Geoenergy Observatories (UKGEOS) facility at Thornton Science Park in Cheshire. This release from the British Geological Survey (BGS)...
  • basildon_cs2012_padc6

    Publisher
    Basildon Borough Council
    Updated
    3 January 2018
    The Priority Areas for Development and Change were developed within the 2012 Core Strategy document. This was not formally adopted, but the work performed influenced later planning policy...
  • basildon_cs2012_padc10

    Publisher
    Basildon Borough Council
    Updated
    3 January 2018
    The Priority Areas for Development and Change were developed within the 2012 Core Strategy document. This was not formally adopted, but the work performed influenced later planning policy...
  • basildon_cs2012_padc1

    Publisher
    Basildon Borough Council
    Updated
    3 January 2018
    The Priority Areas for Development and Change were developed within the 2012 Core Strategy document. This was not formally adopted, but the work performed influenced later planning policy...
  • basildon_cs2012_padc12

    Publisher
    Basildon Borough Council
    Updated
    3 January 2018
    The Priority Areas for Development and Change were developed within the 2012 Core Strategy document. This was not formally adopted, but the work performed influenced later planning policy...
  • basildon_cs2012_padc11

    Publisher
    Basildon Borough Council
    Updated
    3 January 2018
    The Priority Areas for Development and Change were developed within the 2012 Core Strategy document. This was not formally adopted, but the work performed influenced later planning policy...
  • basildon_cs2012_padc13

    Publisher
    Basildon Borough Council
    Updated
    3 January 2018
    The Priority Areas for Development and Change were developed within the 2012 Core Strategy document. This was not formally adopted, but the work performed influenced later planning policy...
  • basildon_cs2012_padc2

    Publisher
    Basildon Borough Council
    Updated
    3 January 2018
    The Priority Areas for Development and Change were developed within the 2012 Core Strategy document. This was not formally adopted, but the work performed influenced later planning policy...
  • basildon_cs2012_padc3

    Publisher
    Basildon Borough Council
    Updated
    3 January 2018
    The Priority Areas for Development and Change were developed within the 2012 Core Strategy document. This was not formally adopted, but the work performed influenced later planning policy...
  • basildon_cs2012_padc4

    Publisher
    Basildon Borough Council
    Updated
    3 January 2018
    The Priority Areas for Development and Change were developed within the 2012 Core Strategy document. This was not formally adopted, but the work performed influenced later planning policy...
  • basildon_cs2012_padc7

    Publisher
    Basildon Borough Council
    Updated
    3 January 2018
    The Priority Areas for Development and Change were developed within the 2012 Core Strategy document. This was not formally adopted, but the work performed influenced later planning policy...
  • basildon_cs2012_padc5

    Publisher
    Basildon Borough Council
    Updated
    3 January 2018
    The Priority Areas for Development and Change were developed within the 2012 Core Strategy document. This was not formally adopted, but the work performed influenced later planning policy...
  • basildon_cs2012_padc8

    Publisher
    Basildon Borough Council
    Updated
    3 January 2018
    The Priority Areas for Development and Change were developed within the 2012 Core Strategy document. This was not formally adopted, but the work performed influenced later planning policy...